More walls framed up and some specialty concrete...

Here is some pictures of the concrete work that is I am getting done on the entryway steps. This is a split level entryway, so the thresh-hold of the door is at about 5' high. There will be concrete walls going up on the sides of the steps that are also going to act as a retaining wall on the left side were we will back fill up against it. We are going to put stone on the inside and outside of the concrete wall. The steps going up are going to be stamped concrete. I'm exited about the way that it is going to look when it is done, but I am not exited about the bill that we are going to get, it is taking a while for them to form up the walls.

The framers are moving right along on the framing, and they should be done shortly after the 4th of July.


Jason